HOME  |  NEWS  |  GALLERY  |  HURRICANE DAMAGE  |  MULTIMEDIA  |  FAQ'S  |  CONTACT US

 

Bridge Maintenance

Keeping traffic on the repaired Twin Span Bridge requires a rigorous inspection and maintenance program.  Maintenance activities sometimes require closure of one or both lanes.  Whenever possible, full closures are limited to overnight hours when traffic demand is lowest.

Maintenance Schedule 

Date

Times

Closure Type

Mon., Aug. 3 10:00 a.m.- 2:00 p.m.

Alternating lane closures on the Westbound bridge.

Tue., Aug 4 10:00 a.m.- 2:00 p.m.

Alternating lane closures on the Eastbound and Westbound bridge.


Maintenance activities are dependent on weather conditions and may be re-scheduled in the event of inclement weather.  Inspections may result in travel delays on the Twin Span Bridge.  Alternate routes include the Causeway Bridge and Interstate 55.  Heavy delays are possible on the U.S. Highway 11 bridge.
 

HOME  |  NEWS  |  GALLERY  |  HURRICANE DAMAGE  |  MULTIMEDIA  |  FAQ'S  |  CONTACT US
Copyright © 2006  Volkert Construction Services, Inc. All rights reserved.